Sunday, February 1, 2009

Flooring Installed!


Ian and I came to Waterloo this weekend and were able to getting the flooring installed in the van and to run the wires for the electrical system. We have a solar panel on order from a place in Barrie, so it doesn't all work yet, but soon we will have LED lights throughout the van, a refrigerator, an inverter to run things off 120V AC power, and additional auxiliary plugs to run random stuff off the 12V system. It's really coming together!

No comments: